|

Suction System is installed
in the right Hole. Then The Skimmer is slipped onto the Suction Pipe. |

Discharge System is installed in the left
Hole. Two Through The Wall Fittings are installed in the remaining two
Holes.
|

Angle Fittings have been screwed onto Suction and Discharge Systems.
Now the air in fitting is being inserted.
|
|

Tank Door: Place bottom corners gentle into place first.
|

Tank Door: Inside view.
Push the Door Structure in and the cardboard out. Once it is lined up, gentle
push down into place. |

Inner Top: Attach Contact Vinyl to underside of Inner Top, and then wrap
edges around outside of Inner Top.
|
|

Inner Top: Place end into Door Structure and drop into place. Vinyl side
down.
|

Temporarily insert Outer Top making sure rear is placed snugly on corners,
then mark perimeter of Door Structure on Top.
|

Remove Top and attach Vinyl using mark as your guide. You want to cover
both inside and outside of the front of the Top. Fold over, the two sides
will stick to each other. Cut a slit in this excess. See next photo.
|